The Utah Data Center is powered by the Cray XC30 supercomputer, which is capable of workloads of more than 100,000 trillion calculations per second.

Total storage capacity is estimated between 3-12 exabytes.

The 1M square-foot data center cost roughly $1.5B-$2B to construct.

The facility, at full capacity, is expected to use 1.7M gallons of water per day